§ 53.030  PLANS, SPECIFICATIONS, CONNECTIONS AND CAPACITY.
   (A)   Plans and specifications for all sewer main extensions shall be prepared by a registered professional engineer. The plans and specifications shall be reviewed, and, if acceptable, approved by the POTW.
   (B)   All sewer stubs and building leads shall be made at the wye branch in the sewer main designated for the property if such branch is available. Any connection not made at the designated wye branch in the sewer main shall be made only as directed by the POTW.
   (C)   It shall be unlawful to connect any sanitary sewer to the existing sewer system until it has been tested. Copies of test results and procedures shall be kept on file for inspection.
   (D)   No sewer extension shall be allowed unless there is capacity available in all downstream sewers, lift stations, force mains, and wastewater treatment plant, including capacity for BOD and suspended solids.
(Ord. 185, passed 4- -2006)