1189.05 CONSTRUCTION STANDARDS.
   (a)   All wireless telecommunications facilities and support structures shall be certified by an Engineer licensed in the State of Ohio to be structurally sound and, at a minimum, in conformance with the Ohio Building Code. Proof of on-going compliance shall be provided to the Director of Safety every ten years by way of an inspection report prepared by an Ohio licensed structural engineer indicating the structural integrity of the tower. The communications company must demonstrate to the City that it is licensed by the Federal Communications Commission (FCC).
   
   (b)   A full site plan shall be required for all proposed cellular or wireless communications sites, at a scale of 1 inch to 100 feet (1" - 100'), indicating, as a minimum, the following:
      (1)   The total area of the site.
      (2)   The existing zoning of the property in question and of all adjacent properties.
      (3)   All public and private rights of way and easement lines located on or adjacent to the property which is proposed to be continued, created, relocated or abandoned.
      (4)   Existing topography with a maximum of five-foot contour intervals.
      (5)   The proposed finished grade of the development shown by contours not exceeding five-foot contour intervals.
      (6)   The location of all existing buildings and structures and the proposed location of the cellular or wireless communications tower and all cellular or wireless communications support structures including dimensions, heights and, where applicable, the gross floor area of the buildings.
      (7)   The locations and dimensions of all curb cuts, driving lanes, off-street parking and loading areas including the number of spaces, grades, surfacing materials, drainage plans and illumination of the facility.
      (8)   All existing and proposed sidewalks and open areas on the site.
      (9)   The location of all proposed fences, screening and walls.
      (10)   The location of all existing and proposed streets.
      (11)   All existing and proposed utilities including types and grades.
      (12)   The schedule of any phasing of the project.
      (13)   Any other information as may be required by the Zoning Board to determine the conformance with this Zoning Code.
         (Ord. 24-99. Passed 3-2-99.)