921.32 MONITORING PROVISIONS.
   Control Manhole. Each industrial user, as defined in Section 921.01 shall construct and maintain, at its own expense a control manhole to allow inspection, sampling and flow measurements of wastes in the building sewer.
   The control manhole may be either an opening to the sewer inside a structure or a manhole. It shall be constructed on the user's premises; however, if the location would be impractical or cause undue hardship to the user, the City may allow construction in a public right-of-way. Ample room shall be provided to allow for safer sampling. The manhole shall be constructed in accordance with the Engineer's requirements and meet all local construction standards and specifications. Unless a time extension is granted, the construction of the manhole shall be completed within ninety (90) calendar days after written notice from the Chief, I.P.P.
   The personnel of the City shall have access to this monitoring facility at all times for inspection and sample collection. If the facility is locked, special arrangements shall be made to allow access. The City personnel shall have the right to set up monitoring devices on the premises. If the industrial user employs a security system which would require proper identification and clearance before entry to the premises, the user shall make necessary arrangements with its security guards so that, upon presentation of suitable identification, City personnel shall be permitted entry without delay to perform their specific responsibilities.