(a) A property owner desiring to install a new sidewalk or repairing an existing sidewalk and desiring to install a new integral concrete street curb with said sidewalk shall be eligible for reimbursement from the City of Ashland at a rate not to exceed six dollars ($6.00) per each lineal foot of approved integral curb installed.
The need for integral curb must be approved by the City Engineering Division prior to removal and installation.
The new integral curb must be inspected and approved by the City Engineering Division and must be in compliance with the standard construction specifications on file in the City Engineering Division.
(b) A property owner desiring to replace an existing free-standing street curb or curb and gutter with a new concrete curb or curb and gutter shall be eligible for payment from the City at a rate not to exceed ten dollars ($10.00) per each lineal foot of approved free-standing curb or curb and gutter installed.
The need for free-standing curb or curb and gutter must be approved by the City Engineering Division prior to removal and installation.
A new free-standing curb or curb and gutter must be inspected and approved by the City Engineering Division and must be in compliance with the standard construction specifications on file in the City Engineering Division.
(Ord. 84-06. Passed 11-7-06.)