§ 164.57  PERMIT AND PERMIT EMBLEM.
   A permit along with a permit emblem shall be issued upon proper application and approval. New sign structure construction shall not commence until a permit and emblem are issued. The sign structure must be completely constructed and erected with the permit emblem affixed within 180 days from the date of the permit issuance. The permit emblem shall be placed on sign structures in such a position as to be visible from the nearest adjacent road.
(Ord. passed 1-22-08)