§ 151.509 STREET STONE AND ASPHALT BASE COURSE.
   Subdivision pavement sections shall include a stone and an asphalt concrete base per ODOT Items 301 and 304. Subgrade preparation shall conform to the Archbold Engineering Standards. The minimum thicknesses of stone base and asphalt concrete base are shown in Table 5:
 
Table 5   Street Pavement | Base Minimum Requirements
STREET TYPE
AGGREGATE BASE
ODOT ITEM
ASPHALT CONCRETE BASE
ODOT ITEM
LOCAL
8 inches
304
3 inches
301
COLLECTOR
8 inches
304
4½ inches
301
ARTERIAL
10 inches
304
5 ½ inches
301 or 302
 
(Ord. 2024-16, passed 2-19-2024)