A wastewater discharge permit shall include such conditions as are deemed reasonably necessary by the Superintendent to prevent pass through or interference, protect the quality of the water body receiving the treatment plant’s effluent, protect worker health and safety, facilitate sludge management and disposal, and protect against damage to the POTW.
(A) The wastewater discharge permit shall be issued for a specified time period, not to exceed five years from the effective date of the permit. A wastewater discharge permit may be issued for a period less than five years, at the discretion of the Superintendent. Each wastewater discharge permit will indicate a specific date upon which it will expire.
(B) A statement that the wastewater discharge permit is nontransferable without prior notification to the village and provisions for furnishing the new owner or operator with a copy of the existing wastewater discharge permit.
(C) Effluent limits, including best management practices, based on applicable pretreatment standards.
(D) The description of the exact sampling location where all representative effluent samples will be taken to verify compliance.
(E) The requirements for self monitoring, sampling, reporting, notification, and record-keeping. These requirements shall include an identification of pollutants to be monitored, sampling frequency, and sample type based on federal, state, and local law.
(F) A statement of applicable civil and criminal penalties for violation of pretreatment standards and requirements, and any applicable compliance schedule. Such schedule may not extend the time for compliance beyond that required by applicable federal, state, or local law.
(G) Requirements to control slug discharge, if determined by the Superintendent to be necessary.
(H) Wastewater discharge permits may also include but need not be limited to, the following conditions as are deemed reasonably necessary by the Superintendent:
(1) Limits on the average and/or maximum rate of discharge, time of discharge, and/or requirements for flow regulation and equalization.
(2) Requirements for the installation of pretreatment technology, pollution control, or construction of appropriate containment devices, designed to reduce, eliminate, or prevent the introduction of pollutants into the treatment works.
(3) Requirements for the development and implementation of spill control plans or other special conditions including management practices necessary to adequately prevent accidental, unanticipated, or non-routine discharges.
(4) Development and implementation of waste minimization plans to reduce the amount of pollutants discharged to the POTW.
(5) The unit charge or schedule of user charges and fees for the management of the wastewater discharged to the POTW.
(6) Requirements for installation and maintenance of inspection and sampling facilities and equipment.
(7) A statement that compliance with the wastewater discharge permit does not relieve the permittee of responsibility for compliance with all applicable federal and state pretreatment standards, including those which become effective during the term of the wastewater discharge permit.
(8) Other conditions as deemed appropriate by the Superintendent to ensure compliance with this chapter, and state and federal laws, rules, and regulations.
(Ord. 05-54, Art. V, § 7, passed 12-19-2005; Am. Ord. 10-56, Art. V, § 7, passed 10-11-2010)