Six-inch cleanouts shall be installed outside of the building foundation wall and shall extend to the ground surface. A removable waterproof cap shall be placed at the top of the cleanout. Materials for the cleanout shall conform to § 52.23(A).
(Ord. 05-54, Art. III, § 15, passed 12-19-2005; Am. Ord. 10-56, Art. III, § 15, passed 10-11-2010)
Penalty, see § 52.99