(A) If the work for which a permit has been issued shall not have begun within six months of the date thereof, or if the construction shall be discontinued for a period of six months, the permit shall be void.
(B) Before work can be resumed, a new permit shall be obtained in the same manner and form as an original permit.
(1997 Code, § 9-102) Penalty, see § 150.999