12-2-13: SPECIAL PRECAUTIONS:
   A.   If any stage of the gradIng of any development site the building department determines by inspection that the nature of the site is such that further work authorized by an existing permit is likely to imperil any property, public way, stream, lake, wetland or drainage structure, the building department may require, as a condition of allowing the work to be done, that such reasonable special precaution to be taken as is considered advisable to avoid the likelihood of such peril. Special precautions may include, but shall not be limited to, a more level exposed slope, construction of additional drainage facilities, berms, terracing, compaction or cribbing, installation of plant materials for erosion control, and recommendations of a registered soils engineer and/or engineering geologist which may be made requirements for further work.
   B.   Where it appears that storm damage may result because the grading on any development site is not complete, work may be stopped the permittee required to install temporary structures to take such other measures as may be required to protect adjoining property or the public safety. On large developments or where unusual site conditions prevail, the building department may specify the time or starting grading and time of completion or may require that the operations be conducted in specific stages so as to ensure completion of protective measures or devices prior to the advent of seasonal rains. (Ord. 92-11-22, 11-2-1992)