§ 152.126 DRAINAGE IMPROVEMENTS.
   (A)   The subdivider shall construct all necessary facilities including underground pipe, inlets, catch basins, open drainage ditches, and detention basins as approved by the Zoning Administrator, to provide for adequate disposal of subsurface and surface water and maintenance of natural drainage course. The developer shall also provide all necessary soil sediment pollution control. Design and construction shall be in accordance with the Design Criteria and Construction Standards and Drawings of the Village of Anna. Adequate provision shall be included in design and construction to accommodate all upstream drainage and, where necessary, extend all drainage improvements to plat limits.
   (B)   It shall state on the final plat that all natural watercourses, detention basins, retention ponds and appurtenances shall be maintained by the property owner. An easement shall be provided to ensure that there will not be any building within the drainage area and to provide for major maintenance and inspection. See Design Criteria for inspection and ownership of detention basins requirements for placement of statement on deeds.
(Ord. passed 1-12-1999) Penalty, see § 152.999