122.08 PERFORMANCE BOND.  
Before any permit shall be issued, the applicant shall post a performance bond with the City of Ankeny to cover the expenses necessary to restore disturbed surfaces, repair existing pavements, replace sod, replace landscaping and otherwise provide restoration of the right-of-way that is disturbed by the construction associated with the utility installation within the right-of-way. The amount of the bond shall be $10,000.00 unless the public works director determines that a larger amount is necessary to be sufficient to cover the cost of restoring the right-of-way to its proper and required condition pursuant to the city's standard construction specifications. The performance bond shall be a surety bond in accordance with the requirements of the current edition of the SUDAS Standard Specifications, Section 1070.
1.   If the Company fails or neglects to properly restore the right-of-way to its proper condition within a reasonable time after notice by the public works director of such failure or neglect, or fails to pay restoration costs incurred by the city to cure, the restoration costs as certified by the public works director shall be promptly paid by the Company or bonding company as the case may be.
2.   In lieu of filing a performance bond in connection with each separate permit application, an applicant with numerous concurrent utility projects may, at the discretion of the public works director, be allowed to post with the City of Ankeny an alternate form of security in the form of an annual performance bond, letter of credit, certificate of deposit, or certified check in an amount deemed sufficient by the public works director, but in no event less than $10,000.00 per utility installation, to secure the applicant's performance of the restoration work which the applicant will become responsible for during the next 12-month period.
(Ord. 1984 - Nov. 19 Supp.)