7-2-6: RESTORATION PROCEDURES:
All restoration of permitted right of way or easement encroachments shall be done in accordance with the following guidelines:
   A.   Excavated material may be replaced in the trench so long as it does not contain any vegetative material and the moisture content is sufficient and not excessive so as to obtain optimum compaction. Backfill must be in lifts of no more than eight inches (8") to twelve inches (12").
   B.   In all paved roads, the subgrade must be compacted in lifts of no more than eight inches (8") to twelve inches (12"). The last six inches (6") of fill must be compacted base course, and the final six inches (6") shall be asphalt or concrete of an approved mix design.
   C.   In all improved gravel roads, the subgrade must be compacted in no more than eight inch (8") to twelve inch (12") lifts, and the last six inches (6") must be compacted base course.
   D.   All material excavated from the encroachment and not replaced in the trench must be removed from the site so as not to leave any nonbase course, asphalt, or concrete material on top of the roadway.
   E.   Final grade and smoothness shall be consistent with village road standards and be approved by the department of public works inspection. (Ord. 2002-01, 1-17-2002)