A. In general, easements for utilities shall be provided where necessary and shall be at least ten feet (10') wide. However, the width of an easement greater or less than ten feet (10') shall be dependent on the type of utility placed.
B. Where a subdivision, land division, or site development is traversed by a watercourse, drainageway, channel, or stream, a stormwater easement or drainage right of way shall be provided which conforms substantially with the lines of the 100-year storm watercourse, and further width or construction, or both, as will be adequate for the purpose and shall conform substantially to an approved drainage plan for the area.
C. All easements shall be in a form as specified and approved by the village public works director, and where applicable, by the village attorney and accepted by the village council. In general, the easement format shall follow the village format for easements. (Ord. 2007-06, 8-14-2007)