18.114.150   DEVELOPMENT REVIEW AND PERMITS.
   .010   Development Review and Permits. Prior to commencing any work pertaining to the erection, construction, reconstruction, moving, conversion, alteration or addition to any building or structure within this Zone, all building and site plans shall be subject to review by the Planning and Building Department of the City for conformance with the Specific Plan and the approved Final Site Plan if required by this chapter and permits shall be secured from the Chief Building Official of the City of Anaheim in compliance with all provisions of Section 18.90.110 (Development Review and Permits); provided further, that where there are existing buildings and structures on a site for which more intensive development is proposed under the provisions of this Zone, no building permit shall be issued until the Chief Building Official and the Fire Chief have certified that the existing buildings and structures are safe for occupancy and for human habitation.
   .020   Landscape Plan Review. The location of all proposed on-site and off-site landscaping, including that within the parkway area (the area within the ultimate street right-of- way as described on the Circulation Element of the General Plan as further described in Section 5.0, the Design Plan of the Specific Plan), shall be shown on a final site plan, or building plans if no Final Site Plan is required, drawn to scale, and shall be subject to the review and approval of the Planning and Building and Public Works/Engineering Departments prior to installation. Such plans shall be consistent with the Specific Plan, a required Final Site Plan approved pursuant to subsection 18.114.040.020 (Final Site Plan Approval) and the provisions of the Design Plan. (Ord. 5378 § 1 (part); June 29, 1993: Ord. 5580 § 35; October 22, 1996: Ord. 5920 1 (part); June 8, 2004: Ord. 6573 § 2 (part); May 7, 2024.)