17.28.160 STANDARDS FOR SUBDIVISIONS.
   .010   All preliminary subdivision proposals shall identify the flood hazard area and the elevation of the base flood;
   .020   All final subdivision plans will provide the elevation of proposed structure(s) and pads. If the site is filled above the base flood, the final pad elevation shall be certified by a registered professional engineer or surveyor and provided to the Planning Director, or designee;
   .030   All subdivision proposals shall be consistent with the need to minimize flood damage;
   .040   All subdivision proposals shall have public utilities and facilities such as sewer, gas, electrical, and water systems located and constructed to minimize flood damage;
   .050   All subdivision proposals shall have adequate drainage provided to reduce exposure to flood damage. (Ord. 4138 § 1 (part); June 3, 1980: Ord. 6512 § 15; August 24, 2021.)