17.04.114   LOT CERTIFICATION.
   .010   Upon completion of building construction and prior to issuance of a Certificate of Occupancy, submittal of a certification by the civil engineer is required, stating that each lot does have positive drainage to the street and/or that a drainage device approved by the City Engineer has been installed to provide adequate lot drainage and is functioning properly; and that lot drainage has been provided in accordance with the final approved grading plan.
   .020   Final Lot Certification. Upon completion of the work and prior to issuance of the final Certificate of Occupancy for the site or development, the City Engineer shall require submittal of the following reports and drawings, and any supplements thereto:
   .0201   An as-graded grading plan prepared by the civil engineer, including original ground surface elevations, as-graded ground surface elevations, lot drainage patterns, and locations and elevations of all surface and subsurface, public or private drainage facilities, private streets, and private sewers. The civil engineer shall provide certification that the work has been completed in accordance with these final as-graded plans;
   .0202   A final soil report prepared by the licensed soil engineer, including locations and elevations of field density tests, summaries of field and laboratory tests, final description of the soils of the site, and other substantiating data and comments on any changes made during grading and their effect on the recommendations made in the original report. The soil engineer shall provide certification as to the adequacy of the site for the intended use. (Ord. 5966 § 16; April 26, 2005: Ord. 5977 § 1; June 14, 2005.)