155.13   CORRECTING DEFECTIVE WORK. 
When a contractor is notified that defects exist in his or her work, said contractor shall make corrections within thirty (30) days after notification. Failure to correct the defect within the thirty (30) days shall result in a stop work order being placed on the building or structure where the defective work exists.