91.11   HYDRANT METER USE AND PAY SCHEDULE.
 
Monthly Hydrant Permit Fee (non-refundable, per assembly)
$100.00/month
1-inch Hydrant Meter Assembly Deposit (per assembly)
$350.00
3-inch Hydrant Meter Assembly Deposit (per assembly)
$1000.00
Water Usage
100% of City rate
 
(Ord. 7-18-2022 #01 (606) - Jul. 23 Supp.)