All pipe laying and backfill in connection with the installation of a building sewer shall be performed in accordance with the State Plumbing Code, except that no backfill shall be placed until the work has been inspected by the inspector.
(`76 Code, § 12-67) (Ord. 280, passed 10-4-67)