9-5-4: CONNECTION CHARGE:
   A.   Definition: The words "new construction", when used in this section, means any new building or structure constructed under a building permit issued by the city after December 31, 1989. (Ord. 1988-12; amd. 2005 Code)
   B.   Charge Established: No person shall, directly or indirectly, discharge, drain, run off, place or deposit, or permit the discharging, draining, running off, placing or depositing of storm or surface waters from his parcel of land on which new construction is to be erected into the municipal storm sewer system, including mains, holding areas and ponds, and other appurtenances and related facilities used for the collection and disposal of stormwater or surface water, without first paying a stormwater utility connection charge (the short title of such connection charge shall be "SWCON") at the time the building permit is issued. The amount of the SWCON shall, for each parcel of land subject thereto, be calculated in accordance with charges as established in section 3-1-3 of this code. (Ord. 2017-01, 1-3-2017)