§ 158.24 STORMWATER MANAGEMENT RATE CONTROL.
   For new development, redevelopment and linear development sites the site design shall provide onsite treatment during construction and post-construction to ensure no increase from existing conditions in offsite peak discharge for the one-year, two-year, ten-year and 100-year, 24-hour storm events based on the standards defined by the MSCWMO or VBWD. For single-family residential building lots not part of a common plan of development site rate control requirements do not apply.
(Ord. 03-2017, passed 3-21-2017)