§ 54.042 ACCIDENTAL DISCHARGE/SLUG DISCHARGE CONTROL PLANS.
   (A)   The Superintendent shall evaluate whether each SIU needs an accidental discharge/slug discharge control plan or other action to control slug discharges. The Superintendent may require any user to develop, submit for approval and implement such a plan or take such other action that may be necessary to control slug discharges. Alternatively, the Superintendent may develop such a plan for any user.
   (B)   An accidental discharge/slug discharge control plan shall address, at a minimum, the following:
      (1)   Description of discharge practices, including non-routine batch discharges;
      (2)   Description of stored chemicals;
      (3)   Procedures for immediately notifying the Superintendent of any accidental or slug discharge, as required by § 54.100; and
      (4)   Procedures to prevent adverse impact from any accidental or slug discharge. Such procedures include, but are not limited to, inspection and maintenance of storage areas; handling and transfer of materials; loading and unloading operations; control of plant site runoff; worker training; building of containment structures or equipment; measures for containing toxic organic pollutants, including solvents; and/or measures and equipment for emergency response.
(Ord. 2021-03, passed 6-14-2021)