§ 153.198 POST-CONSTRUCTION PLAN SUBMITTAL.
   (A)   Changes in plan. Any significant change or deviation in the detailed plans and specifications after granting formal approval shall be filed in duplicate with and approved by the Drainage Board prior to the land development involving the change. Copies of the changes, if approved, shall be attached to the original plans and specifications.
   (B)   Other requirements.
      (1)   Sump pumps. Sump pumps installed to receive and discharge groundwaters or other stormwaters shall be connected to the storm sewer where possible or discharged into a designated storm drainage channel. Sump pumps installed to receive and discharge floor drain flow or other sanitary sewage shall be connected to the sanitary sewers. A sump pump shall be used for one function only, either the discharge of stormwaters or the discharge of sanitary sewage.
      (2)   Down spouts. All down spouts or roof drains shall discharge onto the ground or be connected to the storm sewer. No down spouts or roof drains shall be connected to the sanitary sewers.
      (3)   Footing drains. Footing drains shall be connected to storm sewers where possible or designated storm drainage channels. No footing drains or drainage tile shall be connected to the sanitary sewer.
      (4)   Basement floor drains. Basement floor drains shall be connected to the sanitary sewers.
(Ord. 1997-16, passed 12-8-1997; Ord. 2005-01, passed 2-17-2005) Penalty, see § 153.999