§ 153.197 CERTIFICATIONS REQUIRED.
   (A)   After completion of the project and before final approval and acceptance can be made, a professionally prepared and certified “as built” set of plans shall be submitted to the Drainage Board for review. These plans shall include all pertinent data relevant to the completed storm drainage system and shall include as a minimum:
      (1)   Pipe size and pipe material;
      (2)   Invert elevations;
      (3)   Top rim elevations;
      (4)   Lengths of all pipe structures;
      (5)   Submittal of the data and calculations showing detention basin storage volume; and
      (6)   Certified statement on plans saying the completed storm drainage system substantially complies with construction plans as approved by the Drainage Board.
   (B)   All such submitted plans shall be reviewed for compliance within 30 days after submission to the Drainage Board or the County Surveyor.
(Ord. 1997-16, passed 12-8-1997; Ord. 2005-01, passed 2-17-2005) Penalty, see § 153.999