One or more typical cross-sections of all existing and proposed channels or other open drainage facilities carried into the overbank to a point above the 100-year flood elevation. These shall also show the elevation of the existing land and the proposed changes thereto, together with the high water elevations expected from the 100-year flood under the controlled conditions called for by this subchapter and the relationship of structures, streets, and other facilities. Cross-sections must be represented perpendicular to the expected flow path.
(Ord. 1997-16, passed 12-8-1997; Ord. 2005-01, passed 2-17-2005) Penalty, see § 153.999