§ 153.120 PERMIT PROCEDURES.
   Application for a floodplain development permit shall be made to the Floodplain Administrator on forms furnished by him or her prior to any development activities, and may include, but not be limited to, the following: plans in duplicate drawn to scale showing the nature, location, dimensions, and elevations of the area in question; existing or proposed structures, earthen fill, storage of materials or equipment, drainage facilities, and the location of the foregoing. The Floodplain Administrator may use the forms and processes established for the issuance of an improvement location permit for purposes of the floodplain development permit, if it is not inconsistent with the provisions of this subchapter. Specifically the following information is required:
   (A)   Application stage.
      (1)   A description of the proposed development;
      (2)   Location of the proposed development sufficient to accurately locate property and structure(s) in relation to existing roads and streams;
      (3)   A legal description of the property site;
      (4)   A site development plan showing existing and proposed development locations and existing and proposed land grades;
      (5)   Elevation of the top of the planned lowest floor (including basement) of all proposed buildings. Elevation should be in NAVD 88 or NGVD;
      (6)   Elevation (in NAVD 88 or NGVD) to which any non-residential structure will be flood-proofed; and
      (7)   Description of the extent to which any watercourse will be altered or relocated as a result of proposed development. A hydrologic and hydraulic engineering study is required and any watercourse changes submitted to DNR for approval and then to FEMA as a letter of map revision. (See § 153.119(C)(6) for additional information.)
   (B)   Construction stage.
      (1)   Upon establishment of the lowest floor of an elevated structure or structure constructed on fill, it shall be the duty of the applicant to submit to the Floodplain Administrator a certification of the NAVD 88 or NGVD elevation of the lowest floor, as built. Said certification shall be prepared by or under the direct supervision of a registered land surveyor, professional engineer or architect and certified by the same. The Floodplain Administrator shall review the lowest floor elevation survey data submitted. The applicant shall correct deficiencies detected by such review before any further work is allowed to proceed. Failure to submit the survey or failure to make said corrections required hereby shall be cause to issue a stop-work order for the project. Any work undertaken prior to submission of the elevation certification shall be at the applicant’s risk.
      (2)   Upon establishment of the flood-proofed elevation of a flood-proofed structure, it shall be the duty of the applicant to submit to the Floodplain Administrator a flood-proofing certificate. The flood-proofing certificate shall be prepared by or under the direct supervision of a registered professional engineer or architect and certified by same. The Floodplain Administrator shall review the flood-proofing certification submitted. The applicant shall correct any deficiencies detected by such review before any further work is allowed to proceed. Failure to submit the flood-proofing certificate or failure to make correction required shall be cause to issue a stop-work order for the project.
   (C)   Finished construction. Upon completion of construction, an elevation certification (FEMA Elevation Certificate Form 086-0-33 or any future updates) which depicts the “as-built” lowest floor elevation is required to be submitted to the Floodplain Administrator, if the project includes a flood-proofing measure, flood-proofing certification (FEMA Flood-Proofing Certificate Form 81-65 or any future updates) is required to be submitted by the applicant to the Floodplain Administrator.
(Ord. 2020-7, passed 6-30-2020)