12-1-20: PROPERTIES REMOVED FROM FLOODPLAIN BY FILL:
A floodplain development permit shall not be issued for the construction of a new structure or addition to an existing structure on a property removed from the floodplain by the issuance of a FEMA letter of map revision based on fill (LOMR-F), unless such new structure or addition complies with the following:
   A.   Residential Construction: The lowest floor (including basement), electrical, heating, ventilation, plumbing, and air conditioning equipment and other service facilities (including ductwork) must be elevated to one foot (1') above the base flood elevation that existed prior to the placement of fill.
   B.   Nonresidential Construction: The lowest floor (including basement), electrical, heating, ventilation, plumbing, and air conditioning equipment and other service facilities (including ductwork) must be elevated to one foot (1') above the base flood elevation that existed prior to the placement of fill, or, together with attendant utility and sanitary facilities, be designed so that the structure or addition is watertight to at least one foot (1') above the base flood level that existed prior to the placement of fill with walls substantially impermeable to the passage of water and with structural components having the capability of resisting hydrostatic and hydrodynamic loads or effects of buoyancy. (Ord. 508, 4-1-2013)