§ 154.394 TIME LIMIT.
   Any necessary permits shall be secured and the authorized action begun and completed within the time period specified in the ZBA’s determination. The ZBA may, after a public hearing, extend those periods for good cause shown.
(Prior Code, § 154.359) (Ord. 48, passed 6-21-2005)